Construction Update: Armenian Cultural Garden

Posted by on August 21st, 2010

Most of the infrastructure work on the new Armenian Cultural Garden has been completed.  See photos below demonstrating as much.  Their flag pole, flag and Garden sign have also been installed.  Landscaping will now go forward, however, due to the hot weather and lack of a water outlet in the Garden the landscaping will be “basic” at best, for now.

The Garden’s dedication will be the kickoff event for One World Day on September 19th, Sunday, at 1 PM.

Monument's MLK Jr. Blvd, or front, face bearing Armenian Alphabet

Monument's MLK Jr. Blvd, or front, face bearing Armenian Alphabet

Monument and bench rear sides with Pride of the Nation listing

Monument and bench rear sides with Pride of the Nation listing

Monument, bench and vesica piscis oval symbol of the walkway

Monument, bench and vesica piscis oval symbol of the walkway

Pavers and walkway close-up shot

Pavers and walkway close-up shot