Croatian Garden Moves into Phase 2 in 2013
Posted by Bill Jones on March 11th, 2013
The Croatian Cultural Garden’s phase 2 design has just been released and work begun on getting the requisite approvals and then construction in 2013.
Briefly, phase two extends the very popular water course further up the hillside in combination with a meandering stone & rock stair that parallels the water course, provides an overlook and seating along the way and ends on the East Blvd level with a small overlook plaza and benches. In the future, phase 3 will feature a large plaza and gathering area with various Croatian cultural elements all on the East Blvd level. See a sketch of Phase 2, below.